Request for Quote
Fill out the form and we will contact you to arrange the execution.
Within the framework of the Home Energy Storage Program, households can install an energy storage system with support alongside their existing or new solar panel system. With the help of the storage, a larger portion of the generated electricity can be used locally, reducing grid consumption.
Do you have a question?
If any condition or technical detail is unclear, or if you need help selecting a system, please contact us.
Who can apply for the Home Energy Storage Program?
Who can apply for the Home Energy Storage Program?
Applications may be submitted by individuals who are of legal age, possess a Hungarian tax identification number, and have a permanent address. The property must be owned by the applicant or they must have usufruct rights to it. Properties used for business purposes are not eligible for support.
How much funding can be applied for?
How much funding can be applied for?
The grant is non-refundable and can be requested for up to the total amount of eligible costs, but with a maximum of HUF 2,500,000. The actual grant amount depends on the type of investment and its cost structure.
Is support available for both new and existing systems?
Is support available for both new and existing systems?
Yes. It is possible to install a new solar panel system with energy storage, as well as to expand an existing system with energy storage. The two cases are subject to different technical and permitting conditions.
Is an inverter replacement necessary for an existing system?
Is an inverter replacement necessary for an existing system?
Not in all cases. If the installation of the energy storage system does not alter the grid connection parameters (e.g., power or number of phases), then in many cases the existing inverter can be retained. If the system is not compatible with the energy storage, then an inverter replacement may be necessary.
What is the required minimum battery capacity?
What is the required minimum battery capacity?
The tender requires a minimum nominal capacity of 10 kWh. A larger energy storage system can also be installed if the system meets the technical requirements. The exact size can usually be determined based on annual consumption and solar panel production.
For a new system, what size inverter can be installed?
For a new system, what size inverter can be installed?
When installing a new system, the inverter's power must not exceed 5 kW. The total power of the solar panels is adjusted accordingly and must not exceed 120% of the inverter's rated capacity.
When can the application be submitted?
When can the application be submitted?
The submission period begins on February 2, 2026, at 10:00 AM. Applications must be submitted online. The available budget is limited, so it is advisable to prepare the necessary data and documents in advance.
How much time is available for the execution?
How much time is available for the execution?
A maximum period of 24 months is available from the date of the grant agreement for the installation of the system and the submission of the settlement. The project will only be closed after successful technical handover and administrative inspection.
Can the installation be done by oneself?
Can the installation be done by oneself?
No. The investment may only be carried out by a contractor registered in the program. This is also a condition for the subsidy to be accounted for.
